Brick and stone on a hotel schedule.
A hotel has an opening date, and the brick sits on the critical path. On these projects the mason set thin brick the hour the panel was up, and two of them finished ahead of schedule.
Projects
Hotels on Speedymason.
-
Tru by Hilton
Florence, Kentucky
21,500 square feet of thin brick on Brick Lath, at about half the price of the metal panel system first specified.
-
Aloft Hotel
West Chester, Ohio
19,894 square feet of thin brick over 7,400 square feet of stone, finished weeks ahead of schedule.
-
For the building
Why it suits a hotel.
- It holds the opening date. Brick goes on the day the panel is up, with no wait for a scratch coat to cure. At the Aloft the mason finished weeks ahead of schedule, and at Tru by Hilton ahead of schedule too.
- Brick and stone on one system. The Aloft carries stone on the ground floor and thin brick on the three stories above. Brick Lath and Stone Lath share one water plane behind the panels, so the wall needed no flashing between the two.
- It can rescue a budget. Tru by Hilton was specified with a metal panel system and came in over budget. Switching to Brick Lath cost about half the price of the metal system.
- No brick ledge, no lintels. Thin brick adheres to the wall, so the upper stories carry no shelf angles and the foundation needs no ledge.